Kendall Culvert

WHAT’S IN THE WORKS

Please note as of March 2021 the Broadway Galileo Galilei Binney intersection will have significant traffic impacts temporarily due to construction through Spring 2022. To learn more, click here for a project overview including the scope of work(s) and timeline.

BGGB (Broadway Galileo Galilei Binney)

This project is related to a roadworks request to upgrade the pedestrian and bike paths across Kendall.  BXP will be working on (3) Phases, and the first one is along Galileo from the Broadway intersection until the edge of Binney street.  In this project, we will be upgrading landscaping, lighting, irrigation, walkways, and bike paths.  The temporary ALTA project occurred this past Fall 2020 where we installed bike lanes to prepare the area for the future, and this Spring we will start with the next phase of making this permanent.

Kendall Culvert

This project is related to an infrastructure investment related to sanitary sewage generation.  BXP will be installing a new 16” water main, removing an existing storm water system, and installing a new precast and cast-in-place culvert for stormwater drainage along Broadway from the Galielo intersection and through the Ames Street intersection.  This project will begin in Spring 2021 and go until Spring 2022- as weather permits.   Due to the nature of the project, the work will be within the street and require closure of sections of the street or of the whole street itself.  Traffic will be maintained in both directions on Broadway at all times, but Galileo will be shutdown from approximately Memorial Day until Labor Day to complete major utility work within the intersection of Broadway and Galileo.